We decided to take a run at establishing water supply to the building
As we made our way back to the building, we realized that our huge, beautiful lobby, which had just been renovated, was also destroyed. The water had entered the lobby and reached 2-3 feet up the wall. It became clear that the predicted surge of 5-8 feet was way off. The lobby is 4 feet higher than the garage, meaning that the water really reached a height of around 20 feet.
During the day Friday, several of us, including my neighbor, assessed the situation and decided how to proceed. That afternoon, we decided to take a run at establishing water supply to the building. A pipe had broken, and we sounded out different ideas for a fix. We ultimately decided on capping off the broken line and bypassing the pumps. That meant rigging up a fix with various PVC pieces we found in the maintenance room. Our fix worked, and the building had running water, which included having toilets that flushed, an essential aspect of everyday life that we take for granted.
On Saturday, Sunday, and yesterday, we worked all day cleaning the lobby, removing furniture, tearing out sopping wet carpeting, and attempting to clear walkways. The work was hard, hot, wet, and often smelly. The core group started with two, grew to four, and eventually to six or seven. People showed up with food, water, and Gatorade. As time passed and freezers defrosted, we emptied our neighbor's freezers, discarding spoiled food. We also did our best to keep everyone’s phones charged so contact with insurance companies and concerned friends and family was maintained as well as possible. The stairwells were unlit, which meant every trip up or down this 14-floor building meant carrying some type of a light, which made navigating the steps extremely challenging.