In 2014 and in 2015 Ontario diverted or 'spilled water' as they call it at our hydroelectric power stations in the amount of 3.2 twh each of those years, which is roughly enough hydro to power three hundred and fifty thousand homes for a full year which was not produced because Ontario is over producing power and wind and solar farms have top priority to the power grid. And if you are wondering OPG was paid 47 million per twh for power not produced.
The Liberals are also paying the owners of wind farms two hundred thousand dollars a megawatt for non produced power, while solar farms are getting paid not to produce hydro.